How to use the online dynamic schedule: General

                                                                                  tom-tool.com

1, Dynamic schedule key words introduce:

To access the shift schedule tool, please click tom-tool.com

Shift cycle:  As a shift operator, what ever the shift hours is 12 hours or 8 hours, there is shift cycle always is fixed, for example my shift schedule is 35 days, within the 35 days (figure 1),  we start 4 night shifts as first week, then second week we have three day shifts and 3 night shifts, for the third week, we have 4 day shifts, four week is one week off, five week we have 32 hours training week, 32 training week most people will take vacation, and company policy also want operator take training week off then company will pay less overtime to cover each operators vacation time.

Year: each year have different schedule, dynamic shift includes one year schedule to one table, the purpose of this schedule is to minimize to build each month schedule, every years the dynamic schedule will automatic change

Total team: the total team is used for how many team you have, some company has 4 team, and some team has 5 team which really depends different company operation configuration.

Your team, this schedule is used for which team your are working on, which will be used to hiding another team schedule then only to show your team schedule

Country: due to dynamic is most powerfully shift online schedule online in the world, so it is can be used in the world wide, the major reason is different country has different holidays, so country is important factor to select

Schedule: the schedule name to used for select schedule, for example, one company has one schedule so, the first-person login to created there company schedule save to save it as standard schedule, another people will don’t need to build schedule again. just using that schedule.

Figure 1 dynamic online shift schedule for world all people use

2 dynamic tool schedule table introduce:

As per figure 1 to show the shift schedule, as two table, the first small table  to show the key words selection, then there is a select button, the select button is very important for this shift schedule, will introduce it later in this paper

The second schedule table is big table which includes one year shift schedule, it will automatically be generated according to first small table selected, for example if the first table select 35 days cycle, then second table will be generated 5 weeks cycle, if select 28 days then it will be generated 28 days, 4 weeks table.

Then the table shows the weekly day from Monday to Sunday as WD, to show the cycle days CD from day 1 to the first table selected, for example to show up to 35 days which depends how may days cycle selected.

After that table to show each individual team shift schedule, the table use “D” to show day shift, use “N” to show night shift, if nothing on that days, that means it is days off. This also will be generated by first small table selected how may shift.

Underneath of the team shift is detail dates, the month was separated by different color, the even month and old month color is different which can be selected after login. The current day is showing yellow color which can be changed by selection after login.

The red color is showing the holiday, for different country, which can be selected by login

If you use mouse to click the individual cell in the red cell there is another small table pop up to tell which shift you selected and what is the holiday is, figure 2 is showing small table after I  click May 24, the small table is showing date, week day, team, duty, your note (if you login in and has a note in that day) and holiday

Figure 2 click individual cell to show detail information for that day

3  “Select”  button

“Select”  button includes also the calculation and function for this tool, now start test for this button:

Test 1, change year

Let’s select 2022 year, see what is will be happen on this tool, it will show the 2020 schedule for 2022, in the meaning time schedule changed, and holiday also changed.

                                                                          Figure 3, after select 2022 results

Test 2  Change cycle and change country:

Change cycle to 28 days cycle, country change to china, use the drop on the first table and select cycle to 28 and also the same way to changed the country to “China”, then click “select” button”, the tool will automatic generate another table,  the results is showing

figure 4,

Figure 4  after change cycle day to 28 days, and country changed results

From the figure 4, you can see the table change to 4 week cycle and color change for the old and even month, and also changed the vacation display, due to China have long vacation arrangement, so it is showing different holiday pattern.

Test 3,  select another schedule,

At the small table, using different schedule to “zhujiang” then is figure 5, it is showing the “zhujiang” schedule which use Chinese character to show their schedule

                            Figure 5 is showing different schedule, which is 8 hours shift schedule

4, Conclusion

In the finally the online dynamic shift schedule tool provide very strong function, please visit the site tom-tool.com, then you can explore the function as much as possible, which this paper introduced  first step of how to use the tool, before the login.